NHPC Limited has successfully concluded the construction of the dam for the Subansiri Lower Hydroelectric project

Subansiri Lower Hydroelectric project Recently, the GOI had provided 2,000 Mega Watt Subansiri Lower Hydroelectric Project located in Arunachal Pradesh and Assam to India. This project is getting executed by NHPC Limited with the top level of Elevation Level (EL) 210 M which was executed by the Union Minister for Power and New & Renewable Energy Shri R. K. Singh, where NHPC has informed that more than 90% of the total work of the project has already been completed. The construction of all major components, including Dam, Power House and Hydromechanical Works  till date.

Subansiri Lower Hydroelectric project explained

EventDate
Construction CommencementJanuary 2005
Forest Clearance ObtainedOctober 12, 2004
Construction StalledDecember 2011
Construction ResumedOctober 15, 2019
Clearance by NGTOctober 2019

NHPC Limited began construction of the Subansiri Lower Hydroelectric Project in January 2005 after obtaining forest clearance on October 12, 2004. However, construction need to stop the construction from December 2011 to October 2019 as a sequence of local protests. The project construction resumed on October 15, 2019, following clearance by the National Green Tribunal. It is located partly in Assam and partly in Arunachal Pradesh, where the dam is located in the Dhemaji district of Assam, 2.3km away from Gerukamukh, while the powerhouse is located in the Subansiri district of Arunachal Pradesh will be expected to supply 2,000 MW of power when completed. The Subansiri Lower Hydroelectric project is 116 m (381 ft) tall, measured from the river bed and 210 m (690 ft) from the deepest foundation with the length will be 284 m (932 ft) and with the structural volume of 2,250,000 m3 (2,942,889 cu yd). The dam’s reservoir storage has capacity of 1.37 km  (1,110,677 acre⋅ft), of which .44 km3 (356,714 acre⋅ft) tp be used power generation or irrigation

Project Name Subansiri Lower Hydroelectric project
Official NameSubansiri Lower Hydroelectric Power Project (SLHEP)
CountryIndia
LocationArunachal Pradesh
Coordinates27°33′13″N 94°15′31″E
StatusUnder construction
Construction BeganDecember 2007
Construction Cost (Est.)Rs. 62.9 billion (December 2002 est.)
Owner(s)NHPC Limited
Dam TypeConcrete gravity
ImpoundsLower Subansiri River
Dam Height116 m (381 ft)
Dam Height (Foundation)130 m (427 ft)
Dam Length284 m (932 ft)
Dam Volume2,250,000 m3 (2,942,889 cu yd)
Spillway TypeSki jump
Spillway Capacity37,500 m3/s (1,324,300 cu ft/s)
Reservoir Total Capacity1.37 km3 (1,110,677 acre⋅ft)
Reservoir Active Capacity0.44 km3 (356,714 acre⋅ft)
Reservoir Surface Area33.5 km2 (13 sq mi)
Power Station OperatorNHPC Limited
Commission Date (Est.)2016-2018
Turbines8 × 250 MW Francis-type
Installed Capacity2,000 MW (max. planned)
Annual Generation7,421 GW·h
Website
https://www.nhpcindia.com/Projects/English/Scripts/Prj_Introduction.aspx?Vid=23

Subansiri Lower Hydroelectric project

In which state Subansiri hydropower project is located?

Subansiri hydropower project is located  partly in Assam and partly in Arunachal Pradesh, where the dam is located in the Dhemaji district of Assam, 2.3km away from Gerukamukh, while the powerhouse is located in the Subansiri district of Arunachal Pradesh

Who is the contractor of Subansiri hydropower project?

NHPC Ltd. Patel Engineering is the contractor of Subansiri hydropower project